Call 131546 and get a quote or book a New Home Inspection for Red Hill online today.

Jim’s Building Inspections conducts new home inspections (also known as new construction inspections) in Red Hill and the surrounding areas. Our expert consultants can assist you with every stage of your build and ensure your new build meets your expectations and the necessary standards.

Our local consultants have extensive experience and hold public liability and professional indemnity insurance—meaning you can have peace of mind when you acquire the services of a Jim’s Building Inspector.

We offer same day service for New Home Inspections in Red Hill and provide written reports via email within 24 hours of the inspection being conducted.

 

New Home Inspection Checklist

There are four key inspection stages which can be carried out for New Home Inspections:


Slab Stage

The slab stage or the base stage inspection is essential in the inspection process. Finished concrete is inspected to ensure there is an even and consistent finish. The surface should not be powdery or flakey. Levels are checked to confirm the slab has been installed within allowable deviation in the over level across and room or the entire build. The edge rebate is checked to ensure it is not “honeycombed” and there is no evidence of steel reinforcement protruding as it must have at least 40mm concrete coverage. The vapour barrier must extend past the poured concrete slab with adequate overlap left so that it extends up the side wall of the slab past the final finished ground level once the construction is completed.

 

Frame Stage

Frame stage inspections are conducted providing an independent assessment of the works to confirm they have been completed ready for stage payment. Internal checks and company appointed inspections are supported with a fresh and focussed and our review monitors the frame with respect to the approved construction methods stipulated in Australian Standard 1684.2 and the Engineers design requirements as detailed on the Approved Plans.

The installation of windows and door frames are checked at this stage. Frame positioning in relation to the supporting slab is checked with any overhanging tolerances along with load bearing timbers, lintels and orientation of Jack Studs above openings. Items such as the correct number of timber blocks and their securing method are checked along with all bracing, mechanical fasteners, tie downs and anchors.

 

Lockup

At this stage we inspect the roofing that is installed to ensure it is complete and free of defects and damage, all flashings are installed. A visual inspection is carried out to check the installation of Flashings. Brick work is checked for correct installation. All windows and doors are installed with the correct fixings using appropriate blocks and the frame straight, plumb and true.

The installed plaster to the ceilings, wall linings and fitted cornice is checked to ensure it is installed to acceptable standards. Waterproof membrane to showers & wet areas are inspected to ensure they are correctly installed and comply with the requirements of the Building Code.

 

Handover

Handover Inspections require an exhaustive check of the construction. At handover inspection we check that all the work completed “In a proper and workman like manner” ensuring that the workmanship is at an industry standard. The construction of the dwelling needs to reflect the Approved Plans and we check that all components of the building comply with relevant Australian Standards and Building Codes.

Handover or Final stage inspections are also called Practical Completion Inspections (PCI) and Pre Handover Inspections. Handover inspections are generally carried out on new homes when construction of the entire home has been completed and all internal fittings, fixtures and finishes have been installed and applied inside the home compliant with the relevant building plans and specifications.

 

To arrange a quote or a building inspection for a property in Red Hill, call Jim’s Building Inspections on 131546.
Or book your Red Hill New Home Inspection service online. Reports can be delivered within 24 hours of inspection.

How Different Methods of Property Sale Impact When You Need a Building Inspection

THE TIMING OF A BUILDING INSPECTION DEPENDS ON YOUR SITUATION AND MOSTLY THE METHOD OF SALE. As the findings of a building inspection report may cause you to withdraw an offer you should always ensure that you are informed of your ri...
Read more

Asbestos Concerns? Call The Experts

Here’s an all too familiar story from the Newcastle Herald: A Glendale property is demolished after its owners found deadly loose-fill asbestos insulation. This type of asbestos was relatively popular in the1960s and 1970s. Science now tells ...
Read more

Am I An Owner Builder?

Whether you are or aren’t an owner builder can sometimes be a tricky concept to get your head around. Even if you didn’t personally lift a hammer, but rather project managed different trades to do the work, – you are still, legally, the owne...
Read more

Termite Damage Is Leading Factor When Buying Queensland Homes

Are you buying a home or investment property in Queensland? Amongst the important things to consider is the termite and borer status of your intended property. It is recommended that you should always have both a pre-purchase building inspection a...
Read more

Fact - Termites Hate Good Building Inspectors

A good building inspector knows how to find termite issues. A bad building inspector, by way of contrast, is a termite’s best friend. When Joe Blow (not his real name) bought a two-bedroom 1920s terrace in Sydney’s inner west for around $1 mil...
Read more

Meth testing - the new norm for prudent home buyers

The New Norm? Including Meth checks in Pre-Purchase Building Inspections For home buyers there is nothing unusual about organising a Pre-Purchase Building Inspection on a potential property purchase. For smart buyers, a Pre-Purchase Building Inspe...
Read more

Your Health Health Before Mould

Imagine if you were battling the following: Nose bleeds, chest infections, sinus troubles, asthma, hair loss, breathing issues, chronic fatigue, rashes and headaches. Sad to say, but these are just some of the potential consequences of living with...
Read more

Beating the Dangerous World of Mould - Related Illnesses

Moving to a share house is an exciting adventure for young adults. At least, that’s the theory. So when healthy Tim Kirby started losing weight, developing insomnia, experiencing frequent headaches and battling fatigue, he was in search of answers....
Read more

New homes & Termite zones

An increasing number of councils across Australia are seeing the value in designating residential zones as termite prone areas in an effort to help local communities avoid costly repairs and horror surprises in the future. Victoria is the only Aus...
Read more

Tips For First Home Buyers.

With government policy and a market that has cooled in recent times, the opportunities for first home buyers is really exciting. The dream of buying your first home is becoming a reality. There are however so many factors to look out for before you r...
Read more


In Red Hill

wa Suburbs Index

New Home Inspections suburbs in caversham region